{"id":7380,"date":"2022-08-11T19:28:20","date_gmt":"2022-08-11T19:28:20","guid":{"rendered":"https:\/\/apexenggroup.com\/?post_type=projects&p=7380"},"modified":"2023-12-14T19:41:15","modified_gmt":"2023-12-14T19:41:15","slug":"nddot-us-85-nd-200-to-long-x-bridge","status":"publish","type":"projects","link":"https:\/\/apexenggroup.com\/projects\/nddot-us-85-nd-200-to-long-x-bridge\/","title":{"rendered":"NDDOT<\/br>US 85 \u2013 ND 200 to Long X Bridge"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

NDDOT - US 85
ND 200 to Long X Bridge<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Project Details<\/h4>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

This project consists of expanding 20 miles of US 85 to a four-lane highway from the ND 200 intersection to Long X Bridge. The scope of work includes preliminary survey, earthwork, culvert installation and extensions, asphalt pavement, geotechnical analysis for landslide mitigation, right-of-way acquisition, and private utility coordination and relocation. The Apex environmental team lead the environmental coordination for the project, including:<\/p>