{"id":6833,"date":"2022-07-28T21:20:16","date_gmt":"2022-07-28T21:20:16","guid":{"rendered":"https:\/\/apexenggroup.com\/?post_type=projects&p=6833"},"modified":"2022-08-03T18:01:40","modified_gmt":"2022-08-03T18:01:40","slug":"sanford-health-legacy-wing-renovation","status":"publish","type":"projects","link":"https:\/\/apexenggroup.com\/projects\/sanford-health-legacy-wing-renovation\/","title":{"rendered":"Sanford Health
Legacy Wing Renovation
Electrical System Design"},"content":{"rendered":"\t\t
The new renovation of the 3rd, 4th, and 5th floors of the 1952 portion of Sanford Medical Facility is a key component of Sanford\u2019s overall expansion plan. The primary goal of the 27,000 ft2 renovations will allow the medical center to add support services to 36 patient rooms.<\/p>
The fifth floor will allow the twelve patient rooms to be broken into isolation rooms consisting of three groups of four. Isolation rooms would be flexible and enable each group to be contained, air exchange wise, and handle all known health care situations.<\/p>
The project is complex and will extend the electrical design to the main electrical room on the first floor of the 1972 addition.<\/p>
\u00a0<\/p>
\u00a0<\/p>
\u00a0<\/p>
\u00a0<\/p>
The project is expected to be completed in the fall of 2023.<\/p>
\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
Electrical Design<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Sanford Health<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Bismarck, ND<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t